Post Buying Request

Mingzhu Fused Alumina to Strengthen Safety Production in Winter

Recently, Mingzhu Fused Alumina Company has taken a series of measures to strengthen the company's safety production in winter.

From: iAbrasive.comDate: 2014-11-26 08:12:57Views: 666

Recently, Mingzhu Fused Alumina Company has taken a series of measures to strengthen the company's safety production in winter.

Strengthen "Five Preventions" promotion and management. Organize staff to learn fire prevention knowledge to improve their sense of fire prevention. Enhance car maintenance and education on drivers. Allocate winter protection supply, such as cotton-padded clothes. Mend the roof of finished-parts storage in case of terrible weather, such as rain and snow, which may cause the roof leakage.

Enhance hazards treatment and control. Develop safety production inspection, focusing on working spot and important production equipment. Make timely maintenance to hazards and problems.

brown fused alumina

Reinforce manufacturing techniques management. As to raw materials frozen, the brown fused alumina blocks are required cooling down for at least one-day time before they are transported. Staff that are in charge of blocks crushing should not conduct batch charging in bulk, or the frozen blocks may enter into the production lines and block up the screen. As to the phenomena of conveyer belts fracture, the company formulated regulations concerning equipment preheating. After the conveyer running open for a period of time, rigid tape will softened to the full extent, thus it is not likely to fracture.

Intensify outdoor safety management. Outdoor workers are easy to be injured. Mingzhu Fused Alumina Company has formulated relevant measures and try every means to improve the working conditions. At the same time, the company also convenes daily meetings to remind the workers of production safety problems.

Author: Yuan Jie
Source: Sanmenxia Mingzhu Electric Metallurgical Co., Ltd.
Editor: iAbrasive.com

share: